This project includes the conversion of dirty manufacturing space to a clean pass-through from one fabrication facility to another. The scope of work included BIM LOD 400, large amounts of on-site and off-site prefabrication, coordination between multiple trades throughout the BIM and construction process and working with the owner to achieve their deadline milestones.
HIGHLIGHTS
Manufacturing facility
New construction
Operational campus
Utility infrastructure tie-in
Off-site prefabrication
ROLE OF FIRM
Subcontractor
SIZE
500,000 SF
CONSTRUCTION DATES
December 2015 – December 2017
DELIVERY METHOD
Design-Bid-Build
OWNER & GENERAL CONTRACTOR
Confidential Client
LOCATION
Arizona