OC-Water optimized both power and instrumentation controls for an underground ductbank system and conduit/cable schedules. The scope of work involved the following: BIM model ductbank system, Installment of electrical and I&C infrastructure for WAS tank area, Dewatering, Drain/Outfall, and Odor Control.
ROLE OF FIRM
Subcontractor
SIZE
640,000 SF
CONSTRUCTION DATES
May 2020
DELIVERY METHOD
Integrated Project Delivery
OWNER & GENERAL CONTRACTOR
Confidential Client
LOCATION
Arizona