New aerobic digester facility including concrete basins with a total volume of approximately 2.1 MG jet mixing and aeration system, new thickened waste activated sludge and digested sludge pumping equipment, 6,000 SF of pre-engineered metal blower and pump buildings, new primary electrical power, instrumentation and controls, integration of digester process control into existing plant SCADA network.
ROLE OF FIRM
Subcontractor
OWNER & GENERAL CONTRACTOR
City of Hobbs, RMCI
COMPLETION DATE
December 2020
LOCATION
Hobbs, NM